Work on our St John’s Wood Villa was completed in Autumn 2022.
Pictured below: Temporary piles were formed to support the existing house above whilst the basement was excavated. Now that the basement liner walls and floor slabs have been formed the temporary piles have been removed to make way for the basement pool.